Toyota Corolla (E120): Short in p squib (2nd step) circuit

Dtc b1185/57 short in p squib (2nd step) circuit

Share this page:

Other materials:

Inspection
1. Headlamp dimmer switch assy Inspect light control switch continuity.  Measure the resistance according to the value(s) in the table below. Standard: Inspect headlight dimmer switch continuity.  Measure the resistance according to the value(s) in the tabl ...

On–vehicle inspection
1. Inspect w/receiver condenser assy  if a fin of the w/receiver condenser assy is dirty, clean it with water and dry it with compressor air. Notice: do not damage the fin of the w/receiver condenser assy.  if a fin of the w/receiver condenser assy is bent, make it straig ...

Inspection procedure
1 Inspect skid control ecu connector(+bs terminal voltage) Disconnect the skid control ecu connector.  measure the voltage between terminals +bs (2) and gnd (1, 23) of skid control ecu harness side connector. Voltage: 10 – 14 v 2 Reconfirm dtc Check the dtc . Ok : ...