Toyota Corolla (E120): Short in p/t squib (rh) circuit (to ground)

Dtc b0132/61 short in p/t squib (rh) circuit (to ground)

Share this page:

Other materials:

Monitor description
The battery supplies electricity to the ecm even when the ignition switch is off. This electricity allows the ecm store data such as dtc history, freeze frame data, fuel trim values, and other data. If the battery voltage falls below a minimum level, the ecm will conclude that there is a fault ...

Inspection procedure
1 Check p squib circuit(airbag sensor assy center – instrument panel passenger airbag assy) Disconnect the negative (–) terminal cable from the battery, and wait at least for 90 seconds.  disconnect the connectors between the airbag sensor assy center and the instrument panel ...

Engine
On–vehicle inspection Hint: inspect these items on a cooled down engine. 1. Inspect drive belt 2. Replace spark plugs 3. Inspect air filter Remove the air filter.  visually check that the air filter is not excessively damaged, dirty or oily. Peplace the air filter if nece ...