Toyota Corolla (E120): Open in p squib (2nd step) circuit

Dtc b1186/58 open in p squib (2nd step) circuit

Share this page:

Other materials:

Entire combination meter does not operate
Wiring diagram Inspection procedere 1 Check fuse Check that continuity exists of dome fuse.  check that continuity exists of gauge fuse.  check that continuity exists of am1 fuse. 2 Inspect combination meter assy Check continuity.  Disconnect the ” ...

Cleaning and protecting the vehicle exterior
Perform the following to protect the vehicle and maintain it in prime condition: ● Working from top to bottom, liberally apply water to the vehicle body, wheel wells and underside of the vehicle to remove any dirt and dust. ● Wash the vehicle body using a sponge or soft cloth, such a ...

Malfunction in water temperature receiver gauge
Wiring diagram Inspection procedure 1 Read value of hand–held tester Check output value of ecm.  Connect the hand–held tester to dlc3.  Turn the ignition switch to on and push the hand–held tester main switch on.  Select the data list mode on the hand–he ...