Toyota Corolla (E120): Starting & charging

Preparation

Sst

Recomended tools

Recomended tools

Equipment

Equipment

Front suspension

    Share this page:

    Other materials:

    Inspection procedure
    1 Inspect dlc3 terminal voltage(tc terminal) Turn the ignition switch to on.  measure voltage between terminals tc and cg of dlc3. Ok: voltage: 10 – 14 v 2 Check harness and connector(dlc3 – body ground) Check for open and short circuit in harness and connector betw ...

    Power door lock control system
    Symptom Suspected area All doors are not operated by driver’s door key cylinder interlocked with key Door lock control switch Front door lock assy lh  Wire harness Integration relay Key confinement prevention function does ...

    Circuit description
    The p/t squib (lh) circuit consists of the airbag sensor assy center and seat belt pretensioner (lh). It causes the srs to deploy when the srs deployment conditions are satisfied. Dtc b0135/73 is recorded when a short is detected in the p/t squib (lh) circuit. Wiring diagram ...